NEW QUESTION 80
This metric is a measure of equipment or asset performance based on actual utilization time, availability, performance efficiency and quality of product or output over all the hours in the period. TEEP is expressed as a percentage.

 
 
 
 

NEW QUESTION 81
You are new to the job of maintenance manager. As you start reviewing the work done by your five planners you find that, on average, they are dividing their time as follows:
5% Interviewing area personnel to scope out jobs
2% Creating pipe sketches and other small drawings
9% Ordering materials through the Computerized Maintenance Management System (CMMS)
5% Creating work order estimates
15% Researching what spare parts are needed and where to find them
25% Expediting materials that have not come in yet
5% Creating material kits for future jobs and maintaining the kitting area
1% Creating formal job steps in the work order record in the CMMS
10% Checking on field progress of the larger jobs
15% Talking with mechanics to explain the details of work they are to perform
8% Closing work orders and other data clean up tasks in the CMMS
In which two areas should you concentrate onto make the planners more productive?

 
 
 
 

NEW QUESTION 82
average availability over a specific time period when an asset is available for use. It is also called mean availability

 
 
 
 

NEW QUESTION 83
metrics that describe the Reliability, Availability and Maintainability (RAM) characteristics of a component, asset or even facility

 
 
 
 

NEW QUESTION 84
What most strongly influences the development of people skills in a Maintenance and Reliability organization?

 
 
 
 

NEW QUESTION 85
The Weibull distribution with a shape factor less than 1 is associated with burn in or early life failures that could be caused by:

 
 
 
 

NEW QUESTION 86
Which of the following tools of analysis ranks problems by importance?

 
 
 
 

NEW QUESTION 87
Work done to restore the function of an asset after failure or when failure is imminent. → Corrective Work

 
 

NEW QUESTION 88
Availability × Performance Efficiency × Quality

 
 
 
 

NEW QUESTION 89
What would dictate the basicminimum skill requirements for new Maintenance and Reliability employees?

 
 
 
 

NEW QUESTION 90
During design

 
 
 
 

NEW QUESTION 91
Examples of workplace ethics issues include everything except:

 
 
 
 

NEW QUESTION 92
Which of the following tools of analysis ranks problems by importance?

 
 
 
 

NEW QUESTION 93
Which of the following is a potential advantage of participatory budgeting?

 
 
 
 

NEW QUESTION 94
Mean Time Between Maintenance (MTBM) = Operating Time (hours) / Number of Maintenance Actions

 
 
 
 

NEW QUESTION 95
defined as the percentage of Actual Run Rate/Cycle Time to the Best Run Rate/Cycle Time

 
 
 
 

NEW QUESTION 96
Management processes and behaviors (mission and vision, people skills) 2.
Operational execution (operations, design and maintenance) 3. Manufacturing performance (availability, quality, cost and benefits)

 
 
 
 

NEW QUESTION 97
Preventive Maintenance is defined as: Maintenance tasks, including inspection, service and or replacement, conducted at regular, scheduled intervals of calendar or operating time established to avoid failure based on average statistical anticipated lifetime.
There are cautions regarding the application of PM: No more than “A” percent of total failures are time based, wear out, in nature. …. thus. PM is an ineffective avoidance action for about *’B” percent of probable failures.

 
 
 
 

NEW QUESTION 98
Preventive maintenance tasks should be grouped by?

 
 
 
 

NEW QUESTION 99
What are the three most significant constraints when developing a Maintenance Reliability organization?

 
 
 
 

NEW QUESTION 100
(%) = (Corrective Maintenance Cost ×100) ÷ Total Maintenance Cost

 
 
 
 

Get Special Discount Offer of CMRP Certification Exam Sample Questions and Answers: https://www.exams4sures.com/SMRP/CMRP-practice-exam-dumps.html

         

Rate this post

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below