NO.37 A civil engineering technologist asked an engineer in training (EIT) to write a deficiency report. After a few revisions, the report is still disorganized and has errors. What would be an appropriate action to take for the technologist?

 
 
 
 

NO.38 What is a silt fence used for?

 
 
 
 

NO.39 A civil engineering technologist is undertaking a final acceptance review of a subdivision. The technologist finds 35 m of deficient sidewalk and three hydrants which were not tested. As part of final acceptance, what should be done to ensure the hydrants get tested and the sidewalk is repaired?

 
 
 
 

NO.40 Which of the following images shows the appropriate tool to measure the slump of concrete?

 
 
 
 

NO.41 Which structural components are indicated by the letters A, B, C, and D in the image below?

 
 
 
 

NO.42 A site inspection reveals a beam that does not conform to Issued for Construction (IFC) drawings. What should be done?

 
 
 
 

NO.43 What subsurface sampling would be most likely conducted during a preliminary site investigation for a proposed building?

 
 
 
 

NO.44 What is a typical concrete slump for a municipal sidewalk?

 
 
 
 

NO.45 A soil sample has a porosity of 40%, and the specific gravity of solids is 2.60. What would be the approximate value of dry density of the soil if the soil is completely saturated?

 
 
 
 

NO.46 A continuous beam is supported in the middle and at both ends. It has a uniform load applied to the top. What will be the reactive forces at the supports?

 
 
 
 

NO.47 A civil engineering technologist works for a contractor. An engineer notifies him that the depth of concrete pilings needs to be increased. What is the first thing the civil engineering technologist should do?

 
 
 
 

NO.48 Which of the following tests would most likely be used to determine if engineered fill was placed to meet contract specifications?

 
 
 
 

NO.49 What material property is measured by a sieve analysis?

 
 
 
 

NO.50 EXCERPT FROM MUNICIPAL BYLAW 1234 – ZONING
Section 3: Single family zone
3.1 All dwellings shall house one family.
3.2 All dwellings shall have a minimum main floor area of 120 m².
3.3 All dwellings shall be constructed a minimum of 10.0 m from the front property line, 15.0 m from the rear property line, and 1.5 m from the side property lines.
3.4 An application that does not fulfill the above requirements shall be referred to Council.

 
 
 
 

NO.51 Which of the following is the best location for a foundation perimeter drain pipe?

 
 
 
 

NO.52 When should soil compaction tests be completed?

 
 
 
 

NO.53 Which of the following illustrates a cantilever?

 
 
 
 

NO.54 What type of delivery method is described in the image below?

 
 
 
 

Civil-Engineering-Technology Exam Questions – Valid Civil-Engineering-Technology Dumps Pdf: https://www.exams4sures.com/CTTAM/Civil-Engineering-Technology-practice-exam-dumps.html

         

Rate this post

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below