NO.54 What is a high level metric used to evaluate the overall effectiveness of a Safety Program?

 
 
 
 

NO.55 Preventive Maintenance is defined as: Maintenance tasks, including inspection, service and or replacement, conducted at regular, scheduled intervals of calendar or operating time established to avoid failure based on average statistical anticipated lifetime.
There are cautions regarding the application of PM: No more than “A” percent of total failures are time based, wear out, in nature. …. thus. PM is an ineffective avoidance action for about *’B” percent of probable failures.

 
 
 
 

NO.56 metrics that describe the Reliability, Availability and Maintainability (RAM) characteristics of a component, asset or even facility

 
 
 
 

NO.57 What is the best way for a Maintenance and Reliability Program to use process parameters?

 
 
 
 

NO.58 Shutdown Work Ratio is defined as the:

 
 
 
 

NO.59 the average length of operating time to failure of a nonrepairable asset or component, i.e., light bulbs, rocket engines

 
 
 
 

NO.60 The amount of time an asset is idle or waiting to run. It is the sum of the times when there is no demand, feedstock or raw material and other administrative idle time (e.g. not scheduled for production).

 
 
 
 

NO.61 MTTR

 
 
 
 

NO.62 Management processes and behaviors (mission and vision, people skills) 2.
Operational execution (operations, design and maintenance) 3. Manufacturing performance (availability, quality, cost and benefits)

 
 
 
 

NO.63 Which of the following is a disadvantage of the FIFO system?

 
 
 
 

NO.64 probability that an item, when used under design conditions in an ideal support environment, will perform satisfactorily. It includes both active repair time and preventive maintenance time, but excludes administrative and logistic delay times

 
 
 
 

NO.65 = Total Maintenance Cost ÷ Standard Units Produced

 
 
 
 

NO.66 corrective work done on previously maintained equipment that has prematurely failed due to maintenance, operations or material problems

 
 
 
 

NO.67 After examining the work order history, a maintenance manager finds 25% of the work orders were written and executed on the same day (unscheduled); 60% were formally scheduled the day before they were started;
20% of the work orders have emergency priority; 10% were on the schedule for about a week; and 5% were on the schedule for about a month or more. Your planners are responsible for expediting materials. The Maintenance Coordinator meets with your planners each afternoon to make the next day’s schedule.
Operations does (Operations do) a good job of preparing equipment for the day’s scheduled work.
Maintenance costs seem high relative to the value of the equipment being maintained. What should be done first?

 
 
 
 

NO.68 When developing and presenting a new strategic plan to stakeholders, which of the following is the most important?

 
 
 
 

NO.69 Which of the following is a major benefit of enterprise resource planning systems?

 
 
 
 

NO.70 What is the relationship between leading indicator metrics and lagging indicator metrics in the field of Maintenance and Reliability?
Options

 
 
 
 

NO.71 Which of the following tools of analysis ranks problems by importance?

 
 
 
 

NO.72 This metric is the ratio of the number of systems in a facility for which a criticality analysis has been performed divided by the total number of systems in the facility, expressed as a percentage. → Systems Covered by Criticality Analysis

 
 

NO.73 A medical care facility is given several options for calculating depreciation on a new piece of equipment.
Which of the following would be the best choice?

 
 
 
 

NO.74 Metrics that describe the Reliability, Availability and Maintainability (RAM) characteristics of a component, asset or even facility → Leading Indicator

 
 

NO.75 Lagging and Leading

 
 
 
 

NO.76 What aspect of improving reliability is most often overlooked?

 
 
 
 

NO.77 MTTR = Total repair or replacement time (hours) ÷ Number of repair/replacement events

 
 
 
 

NO.78 One or more tasks necessary to retain an item in or restore it to a specified operating condition. A maintenance action includes corrective, as well as preventative and predictive maintenance tasks that interrupt the asset function.

 
 
 
 

Get The Important Preparation Guide With CMRP Dumps: https://www.exams4sures.com/SMRP/CMRP-practice-exam-dumps.html

         

Rate this post

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below