Pass LEED-AP-O-M Brain Dump Updated Certification Sample Questions [Q25-Q41]

Pass LEED-AP-O-M Brain Dump Updated Certification Sample Questions

Online LEED-AP-O-M Test Brain Dump Question and Test Engine

USGBC LEED-AP-O-M Exam Syllabus Topics:

Topic Details
Topic 1
  • Location and Transportation: This section measures the skills of the LEED Consultants and addresses alternative transportation and accessibility assessment. A key measured skill is evaluating quality transit access within project boundaries. The content covers transportation survey methodologies, including timing, sample size, and transportation program implementation.
Topic 2
  • Indoor Environmental Quality: This section measures the skills of the LEED Project Managers and focuses on indoor environmental quality management. A key measured skill is determining appropriate ventilation levels for spaces. The domain includes tobacco smoke control, indoor air quality improvements, and ongoing monitoring systems.
Topic 3
  • Water Efficiency: This section measures the skills of the target professionals and covers both outdoor and indoor water use reduction. A key measured skill is calculating irrigation demand for landscape requirements.

 

Q25. When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information

 
 
 
 

Q26. What credit or prerequisite requires a plan for a hazardous spill cleanup?

 
 
 
 

Q27. A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space.
They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public.
According to the Rating System Selection
Guidance, which rating system would be most applicable for this project?

 
 
 
 

Q28. According to the conditions specified for the EAc5: Decarbonization and Efficiency Plans, Option 1. Strategic Decarbonization Plan, which of the following elements should a project team include in their five-year capital plan to ensure compliance?

 
 
 

Q29. Key functional and operational parameters such as occupied hours of a building, use by space type,required temperature settings, and lighting levels, are specified in the

 
 
 
 

Q30. The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

 
 
 
 

Q31. When tracking refrigerant leakage for EAc3: Enhanced Refrigerant Management Performance, what information should be recorded during the recharge process?

 
 
 

Q32. When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields

 
 
 
 

Q33. Which of the following options about project boundaries is correct?

 
 
 
 

Q34. Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

 
 
 
 

Q35. An office building in a coastal region is pursuing LEED O+M certification. Flooding and hurricanes were identified as priority hazards from the climate resilience assessment. The building already has an existing emergency response plan that highlights the priority hazards. The building provides annual emergency preparedness training, has procedures for traffic management and protocols for maintaining critical facilities and systems. Specific roles are assigned in advance for essential personnel, and the emergency response plan is updated annually. The plan is also communicated to relevant service providers, facilities staff and occupants.
What additional element should be included in the emergency response plan for the building to comply with the IPc1: Operational Planning for Resilience credit?

 
 
 

Q36. Which of the following strategies are eligible for reducing the landscape water demand in Water Efficiency Credit, Outdoor Water Use Reduction?

 
 
 
 

Q37. What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?

 
 
 
 

Q38. A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project’s landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

 
 
 
 

Q39. A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

 
 
 
 

Q40. What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?

 
 
 
 

Q41. Which of the following topics needs to be addressed by retail project teams when administering the supply chain survey in order to meet the requirements of Materials and Resources, Ongoing Purchasing and Waste Policy, Option 1?

 
 
 
 

Real USGBC LEED-AP-O-M Exam Dumps with Correct 104 Questions and Answers: https://www.exams4sures.com/USGBC/LEED-AP-O-M-practice-exam-dumps.html

         

Rate this post

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below