ISO-14001-Lead-Auditor Dumps To Pass PECB Exam in 24 Hours – Exams4sures [Q21-Q39]

ISO-14001-Lead-Auditor Dumps To Pass PECB Exam in 24 Hours – Exams4sures

Buy Latest ISO-14001-Lead-Auditor Exam Q&A PDF – One Year Free Update

PECB ISO-14001-Lead-Auditor Exam Syllabus Topics:

Topic Details
Topic 1
  • Managing an ISO 14001 audit program: This section of the exam evaluates the ability of EMS auditors to manage a complete audit program. It includes planning, implementing, monitoring, and continually improving the audit program to align with organizational and compliance goals.
Topic 2
  • Fundamental principles and concepts of an environmental management system: This section of the exam measures the foundational knowledge of EMS auditors and covers key principles such as environmental sustainability, continual improvement, and the process approach. It assesses understanding of how environmental management systems contribute to overall business performance and regulatory compliance.
Topic 3
  • Closing an ISO 14001 audit: This domain focuses on the responsibilities of audit consultants during the audit closure process. It includes evaluating findings, preparing audit conclusions, holding closing meetings, and ensuring proper reporting and communication of results.
Topic 4
  • Conducting an ISO 14001 audit: This part tests the practical skills of EMS auditors in executing the audit, including conducting meetings, collecting audit evidence, interviewing personnel, and documenting findings in accordance with ISO 14001 standards.
Topic 5
  • Fundamental audit concepts and principles: This section of the exam assesses the grasp EMS auditors have on core audit principles such as integrity, fair presentation, due professional care, and evidence-based evaluation. It ensures auditors can apply these principles consistently in the audit process.
Topic 6
  • Environmental management system requirement:This section evaluates the ability of audit consultants to interpret and apply the specific requirements of ISO 14001. It focuses on understanding the structure of the standard, including context of the organization, leadership, planning, support, operations, and performance evaluation.

 

NO.21 In the case of ISO 14001 EMS audits that follow the recommendations of ISO 19011, which two of the following statements are true?

 
 
 
 
 
 

NO.22 You are auditing the ISO 14001 management system of a primary school (School 21st Century) located in downtown Lima, Peru. There are 400 students, attending classes from 9 am until 5.30 pm.
You have presented a nonconformity at the closing meeting:
Non-conformity – No environmental aspect has been identified related to the impact of the education provided by the school on students’ awareness (as future adults) related to generic environmental issues.
Select the three best acceptable corrections that the school may take.

 
 
 
 
 
 
 
 

NO.23 You have been nominated as audit team leader for the second recertification to ISO 14001 of ABC, a public transport organisation in a big city. The audit is planned to take place in two months.
The audit program manager asks you to review the answer provided by ABC to a nonconformity raised by another auditor during the last surveillance audit carried out eight months ago.
The nonconformity reads as follows:
*”ABC does not always communicate its relevant environmental requirements to external providers.
Evidence: A two-month contract signed with a new external provider of the maintenance for ABC’s buses did not contain any relevant environmental requirements.”* Which two would you consider to be the best corrective actions from ABC?

 
 
 
 
 
 

NO.24 Which one of the following conclusions in the audit report is not required by the certification body when deciding to grant certification?

 
 
 
 

NO.25 An internal auditor of a manufacturer of aluminium products for the car industry asked to see the most recent management review minutes and found no reference to the completion of some of the current environmental objectives. He raised a nonconformity against section 9.3.c of ISO 14001 in Report IA202. The nonconformity (NC3) stated:
“Top management has not analysed why some of the environmental objectives have been met since the last management review.” When discussing the finding with the Environmental Manager, the auditor was informed that planned actions taken to complete the current environmental objectives were specifically covered in the internal audit programme and did not need any further work done.
Select one of the options which would constitute an effective response by the Environmental Manager to the nonconformity.

 
 
 
 

NO.26 You are responsible for the second surveillance audit of ABC, a medium-sized metal mechanical manufacturing organisation. The significant environmental aspects are loud noise, solid waste, energy consumption and liquid waste.
During the opening meeting, you are informed that when COVID-19 started, sales increased considerably, so they had to open a third shift, from 10 pm to 6 am. You interview the Production Manager.
You: How did you carry out this change and how did you evaluate the impact on ABC’s EMS?
PM: It was very simple, we just did it.
You: Did you introduce any change in the EMS?
PM: No. It is the same processes, the same products, the same materials, therefore the same environmental aspects.
You: What about the people?
PM: We distributed the most experienced workers among the three shifts. They trained the newly hired personnel.
Which of the six key questions from the following list would you ask? Have you…

 
 
 
 
 
 
 
 
 

NO.27 An audit team leader arrives at a steel fabrication organisation that manufactures fire escape stairs to carry out a Stage 2 certification audit. At a meeting with the EMS Manager, she is informed that they have secured their largest contract from a construction organisation to manufacture and install fire escape stairs. They appointed a subcontractor to perform the installation work. The EMS Manager wants the ISO 14001 audit extended to cover the installation site.
During the audit, a team member found that several complaints had been made to the organisation regarding their installation operators being seen to dispose of excess paint into the site drains, which breached legal requirements. The EMS Manager blames the contractors they had to take on because of the big contract. The auditor raises a nonconformance against clause 8.1 of ISO 14001.
Which one of the following statements would support this finding?

 
 
 
 

NO.28 Just before the closing meeting of a third-party audit, the audit team leader is invited to a meeting with the EMS Manager.
He tells the audit team leader that a member of the audit team was seen taking videos on the factory floor using his mobile phone and wants him suspended from the closing meeting with any nonconformities raised by him rescinded.
When asked about this, the auditor said that he had obtained permission from the Production Manager who was escorting him around.
Select three options of how the audit team leader might respond to the EMS Manager.

 
 
 
 
 

NO.29 A key audit process is the way auditors gather information and determine the findings ‘ characteristics. Put the actions in the correct order to complete this process.

NO.30 Which one of the following options is the definition of an interested party in an EMS?

 
 
 
 

NO.31 An internal auditor of a manufacturer of aluminium products for the car industry raised a nonconformity against section 6.2.2 of ISO 14001 in Report IA202. The nonconformity (NC3) stated:
“Top management has not analysed why none of the environmental objectives set for the last year have been met.” A third-party auditor reviewing the internal audit process came across the nonconformity and found that no corrective action was documented. The EMS Manager confirmed no action had been taken, but added he expected a number of objectives to be achieved in the next three months so there was no need for further action. He explained in confidence that the organisation was fighting a takeover bid and resources for environmental projects had been cut.
From the information, select three non-conformities options that the auditor could raise to ISO 14001.

 
 
 
 
 
 
 
 

NO.32 The audit team leader presents the audit outcome at the closing meeting attended by the Chief Executive and the senior managers of a care home. The agenda involves the reporting of a low number of minor nonconformities in the EMS to ISO 14001. It becomes clear to the audit team leader and team members that the Chief Executive becomes increasingly agitated as the meeting progresses.
Before the audit team leader can present a summary of the audit results, the Chief Executive interrupts the report and angrily claims that the whole process is flawed and that the organisation has wasted its time on trying to get certification because it has chosen the wrong certification body.
Select the one option you would take as the audit team leader in response to the situation.

 
 
 
 

NO.33 Which two audit characteristics are features of a Stage 1 initial certification audit?

 
 
 
 
 
 

NO.34 A group of 22 Italian restaurants in downtown San Francisco (US) established an EMS following the requirements of ISO 14001. You are performing an internal audit before the fourth certification cycle. The audit plan included an audit of the General Manager (GM) as the last interview before the closing meeting.
During the interview with the GM, you audit clause 10.3 (Continual improvement). The dialogue is as follows.
You: Could you please tell me how did you improve the EMS to enhance environmental performance (Clause
10.3)?
GM: One way to improve the EMS is to improve one or several of its processes. We decided to improve the water-consuming processes in all our branches. We use water in many of our processes (e.g. to wash our kitchens, our cutlery, plates, and glasses, to keep our floors clean). The idea was to review these processes in detail to reduce the amount of water used per customer. Each of the 22 branches sent us their results, we analysed the data and found out that the average water consumption per customer was reduced by 13%; therefore, we improved our environmental performance. We are happy about that.
You: What about the results in each branch?
GM: Have a look at this table:

Analysing this table, what would be your decision related to raising nonconformities to clause 10.3? Select two.

 
 
 
 
 
 

NO.35 Sparkle is an organisation that provides mobile car cleaning services at customers’ premises. It has been certified to ISO 14001 for some time and has appointed a new EMS Manager. The audit plan during a surveillance audit includes the improvement actions and the auditor asks to see the most recent management review meeting minutes.
Which six statements would represent output audit evidence for the management review?

 
 
 
 
 
 
 
 
 
 

NO.36 A large public library established an EMS following the requirements of ISO 14001, which was third-party certified 10 years ago. You are performing the second surveillance audit of the third certification cycle. The audit plan included an audit of the Director as the last interview before the closing meeting.
During the interview with the Director, you audit clause 6.2, Objectives and planning to achieve them. The dialogue is as follows:
You: Could you please tell me which environmental objectives were defined for last year and show evidence of their achievement?
Director: Yes. We had defined three objectives. As you can see from our Annual Plan, one of them was to separate our waste into four categories: paper, plastics, metals, and food. Before, we had only three, because plastic and paper were disposed of together. We developed an Action Plan to achieve this objective.
Which six of the questions would you ask related to the Action Plan?

 
 
 
 
 
 
 
 

NO.37 An audit team leader arrives at a steel fabrication organisation that manufactures fire escape stairs to carry out a Stage 2 certification audit. At a meeting with the EMS Manager, she is told that they have won their biggest contract from a construction organisation to manufacture and install fire escape stairs. They appointed a subcontractor to perform the installation work. The EMS Manager wants the ISO 14001 audit extended to cover the installation site.
Select which one of the options is the correct response by the auditor.

 
 
 
 

NO.38 XM, a chain of 25 petrol stations, established an EMS following the requirements of ISO 14001, which was third-party certified 10 years ago. You are performing an internal audit before the fourth certification cycle.
During the audit to the EMS Manager (EM), the following dialogue takes place:
You: Could you please give me some details on the inspection of underground tanks in each station?
EM: It’s very simple. There is a regulation that requires an annual leak inspection.
You: Who performs these inspections?
EM: I personally contract the inspectors and submit the results to the local authority. These are the certificates submitted last year.
You: I see only 22 certificates. There are three missing.
EM: The tanks of those three stations will be removed next year and replaced by new ones. I phoned the local authority and they told me that I do not need to send any report of the tanks that will be changed.
Which one of the following would be your next question?

 
 
 
 

NO.39 A large chemical organisation, CrackerPRO, has a plant located in a rural area surrounded by livestock farms.
When cleaning several vessels 4-5 times per day, it releases water vapor with a strong acidic smell lasting for
10 minutes each time.
You are conducting a second-stage initial certification audit at the plant. When auditing the processes of assessing impacts and identifying environmental aspects with the Environmental Supervisor, you find that the emission of that acidic vapor has not been evaluated as a significant aspect. During further auditing, you learn that neighbouring farmers have made repeated complaints in the last 6 months about the acid smells and reported an increase in animals becoming sick as a result.
The Environmental Supervisor states that the farmers are looking for financial compensation from the company which their lawyers are resisting. She insists that no legal requirements have been broken and that all complaints have been rejected.
You raise a nonconformity against ISO 14001. Based on the scenario, select one of the options which would constitute an acceptable nonconformity.

 
 
 
 

Download the Latest ISO-14001-Lead-Auditor Dump – 2026 ISO-14001-Lead-Auditor Exam Question Bank: https://www.exams4sures.com/PECB/ISO-14001-Lead-Auditor-practice-exam-dumps.html

         

Rate this post

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below