Free SAP Certification Exams C-TS422-2601 Ultimate Study Guide (Updated 100 Questions) [Q49-Q65]

Free SAP Certification Exams C-TS422-2601 Ultimate Study Guide (Updated 100 Questions)

Get to the Top with C-TS422-2601 Practice Exam Questions

NO.49 Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.50 Which time elements are part of a routing operation?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.51 Which SAP applications can be used for forecasting in Supply Chain Planning?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.52 What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.53 What determines whether the planned independent requirements in dem management are consumed by other requirements?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.54 What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.55 Why do you use Engineering Change Management?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.56 You want to reduce planning efforts for B C classified materials.
Which planning procedure do you recommend?

 
 
 
 

NO.57 In your plant MRP is activated.
Which options do you have to exclude a material from the MRP run?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.58 Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable physically connected tanks?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.59 Which transaction code can you use in SAP S/4HANA to enter and display goods movements?
Please choose the correct answer.

 
 
 
 

NO.60 What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.61 You want to set up a maketoorder planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

 
 
 
 

NO.62 Which business processes are affected by settings in the order type dependent parameters?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.63 Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.64 Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.

 
 
 
 

NO.65 What is a work center hierarchy?

 
 
 
 

Pass SAP C-TS422-2601 exam – questions – convert Tets Engine to PDF: https://www.exams4sures.com/SAP/C-TS422-2601-practice-exam-dumps.html

         

Rate this post

Related Links: www.stes.tyc.edu.tw www.blackhatprotools.info myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below