NO.272 The information for the CRP inputs can be obtained from:

 
 
 
 

NO.273 Based on material flow, processes can be organized in which way?

 
 
 
 

NO.274 Preventive maintenance plus continuing efforts to adapt, modify, and refine equipment to increase flexibility, reduce material handling, and promote continuous flow, is called:

 
 
 
 

NO.275 All expenses incurred by the firm because of the volume of inventory accepted will fall in:

 
 
 
 

NO.276 1. Determine the standard hours of operation time for each planned and released order for each work center by time period.
2. Add all the standard hours together for each work center in each period. These are the steps of calculating:

 
 
 
 

NO.277 Capacity needs to be measured on at which of the following level?

 
 
 
 

NO.278 is a usual process to start with the due date and using find lead time, to work back to operations?

 
 
 
 

NO.279 Operational splitting is practical when:

 
 
 
 

NO.280 Each of the following actions would reduce safety stock levels EXCEPT:

 
 
 
 

NO.281 A work center consists of 4 machines each working a 16-hour day for 5 days a week. What is the weekly available time?

 
 
 
 

NO.282 Material Requirements Planning (MRP) is:

 
 
 
 

NO.283 The formula for the seasonal demand is:

 
 
 
 

NO.284 Which of the following is NOT the source of waste in the operation and management of the manufacturing system?

 
 
 
 

NO.285 What is concerned with removing work content, not with spending money on better and faster machines?

 
 
 
 

NO.286 exists when the cumulative actual demand varies from the cumulative forecast.

 
 
 
 

NO.287 On the overage a company has 12week of work-in-process (WIP) inventory and annual cost of goods sold of 36$ million. Assuming the company works 50 weeks per year.
What is the dollar value of the WIP?

 
 
 
 

NO.288 When a job might be expanded to include a sequence of activities instead of only one activity, this is called

 
 
 
 

NO.289 There are two ways to determining the capacity available; out of which is figured from historical data and is based on available time, utilization and efficiency.

 
 
 
 

NO.290 To plan the processing of materials through manufacturing PAC must have the following information EXCEPT:

 
 
 
 

NO.291 It should be recognized that order winners and qualifiers for any product market combination are not static. not only will customers change perspectives as competitors jokey for position but the order winners and qualifiers will often change based on the concepts of:

 
 
 
 

NO.292 People should not only be trained in their own jobs but should also be cross-trained in other skills and in problem solving techniques, in order to achieve:

 
 
 
 

NO.293 What means doing it right the first time and, if something does go wrong, stopping the process and fixing it?

 
 
 
 

NO.294 is a two-step process. First determine the time needed for each order at each order at each work center. Then sum up the capacity required for individual orders?

 
 
 
 

NO.295 A statistical value that measures how closely the individual values cluster about the average is called:

 
 
 
 

NO.296 Dependency in MRP can be

 
 
 
 

APICS CPIM Test Engine PDF – All Free Dumps: https://www.exams4sures.com/APICS/CPIM-practice-exam-dumps.html

         

4/5 - (1 vote)

Add a Comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below